Bulina Roșie − ce urmează după ce ne „obișnuim” cu clădirile încadrate în clasa I sau II de risc seismic – note

NOTE:

  1. Peters, E. M., Burraston, B., & Mertz, C. K. (2004). An Emotion-Based Model of Risk Perception and Stigma Susceptibility: Cognitive Appraisals of Emotion, Affective Reactivity, Worldviews, and Risk Perceptions in the Generation of Technological Stigma. Risk Analysis, 24(5), 1349–1367. http://doi.org/10.1111/j.0272-4332.2004.00531.x
  2. Primăria municipiului București. (n.d.). Listele imobilelor expertizate tehnic din punct de vedere al riscului seismic actualizate la 09.09.2016. Retrieved from http://www.pmb.ro/servicii/alte_informatii/lista_imobilelor_exp/docs/Lista_imobilelor_expertizate.pdf
  3. World Bank. (2012). Romania – Hazard Risk Mitigation and Emergency
    Preparedness Project. Washington DC: World Bank. Retrieved from http://documents.worldbank.org/curated/en/283111468333032456/Romania-Hazard-Risk-Mitigation-and-Emergency-Preparedness-Project
  4. The Economist. (2015, April 30). How to make a building quake-proof. The Economist. Retrieved from http://www.economist.com/blogs/economistexplains/2015/04/economist-explains-31
  5. Hotărâre pentru aprobarea programului de acțiuni pe anul 2015 privind
    proeictarea și execuția lucrărilor de intervenție pentru reducerea riscului seismic la construcțiile cu destinația de locuințe multietajate, încadrate prin raport de expertiză tehnică în clasa I de risc seismic și care prezintă pericol public (partea I, nr 233/ 6.IV.2015 No. Monitorul Oficial al României). Retrieved from http://www.mdrap.ro/userfiles/constructii_siguranta_postseism_2015.pdf

Inapoi la articolul “Bulina Roșie − ce urmează după ce ne „obișnuim” cu clădirile încadrate în clasa I sau II de risc seismic” aici